Edinburgh 0131 445 7989
Nottingham 0115 969 9859
info@jupiterplay.co.uk
  • Client: Primary Schools UK Wide
  • Project: Primary Spaces
  • Budget: £1.5 million
  • Year Installed: 2015

Primary Spaces, A multi-site contract

Primary Spaces was an £18 million project to improve primary school Physical Education. This was delivered through 5 waves, in which Jupiter Play was successful in all of them delivering at least 8 projects per wave to the total value of £1.5 million. There were very strict guidelines set out by Sport England on the style and quality, which required a large degree of bespoke work.

Jupiter Play worked with the Park Leisure Zones MUGA. 100% of the products are manufactured in the UK and this  is hugely beneficial as this minimises lead times and provides the opportunity to work in consultation to create bespoke products, like those set out in the primary spaces guidelines.

Download Case Study
"I was pleased with the level of communication provided by both the principle contactor and sub-contractor, and the work was completed on time and without issue." Alistair Moore, St Fidelis Catholic Primary School

Related Case Studies